Starting Monday, Aug. 7, and continuing through Wednesday, Oct. 25, 2017, the hot water line between Buildings 400 and 450 will be undergoing repairs.
The Building 400 and Building 450 parking lots and the Building 401 dock will be closed during construction. The road between Building 400 and the Building 450 parking lot will also be closed. Alternate parking can be found in the Building 400 overflow parking lot.
Site occupants are required to follow traffic and construction signage. Pay close attention to your surroundings and watch for pedestrians.